Jun. 25th, 2012

Walkies!

Jun. 25th, 2012 10:10 pm
ffutures: (Default)
I walked home along the canal again tonight, got a nice picture of a coot that appeared to be walking on water, but was actually standing on a submerged boom, and I think the same swans and cygnets I've seen before - the cygnets are now bigger than most ducks:

Watch the birdie )

After that I went to see what's happening in the Crossrail portal; the answer appears to be that they're adding a load of conveyor belts, ducts, etc. which have now filled most of the tunnel entry - that's why they could only connect them after the machines set off. Eventually they will need several MILES of this stuff, which is why it's so massive (and why the infrastructure now stretches about half way to Paddington station). The video I linked to a while ago shows more about how it all works.

crossrail portal )

At the moment most of the conveyor belt hasn't been fitted, I have no idea what the time frame for this is, except that they seem to be working pretty fast.

February 2026

S M T W T F S
1 23 4567
8 910 11 121314
15 1617 18 192021
22232425262728

Most Popular Tags

Page Summary

Style Credit

Expand Cut Tags

No cut tags
Page generated Feb. 23rd, 2026 02:21 am
Powered by Dreamwidth Studios