ffutures: (Default)
[personal profile] ffutures
...it's the Giant Tunnelling Machine of Doom

Some time last night they raised the footbridge again and got the first tunnel building machine under it - I'm not sure how complete it is at this stage, I suspect that they're still finishing assembly and tests. And will be proved wrong if it starts work tomorrow, of course.

I saw it looming through the mist this morning, but it was too misty to get good photos - tonight things were a lot clearer. This thing really is BIG, about 100 metres long - I've just taken successive pictures starting with the full visible length of it and ending with a zoom in on the cutting edge of technology.

There are trains on two of the six older lines passing the house - the red one is a Hammersmith and City underground train going off and down into a tunnel to the left, the other one is on the nearest or second nearest of four main lines - there's also a siding even nearer the wall, but it's rarely used now because it isn't electrified.

Pictures are on Wikipedia Commons if you follow the links.



I forgot to add wikipedia category tags for the pictures I uploaded on Sunday and can't figure out how to do it - can anyone tell me?

Date: 2012-03-15 10:21 pm (UTC)
From: [identity profile] ffutures.livejournal.com
I'd love to know how they make the GPS work underground - mine has trouble if there are trees in the way.

Date: 2012-03-15 10:41 pm (UTC)
From: [identity profile] curiouswombat.livejournal.com
Dwarves... damned clever little buggers.

Date: 2012-03-15 10:42 pm (UTC)
From: [identity profile] gonzo21.livejournal.com
Did they build this machine specifically for this project, or is it a machine that they've rented from Giant Tunnelling Machines Of Doom R Us?

Date: 2012-03-15 11:31 pm (UTC)
From: [identity profile] ffutures.livejournal.com
As I understand it, usually these things are built for a single job and are pretty much clapped out by the end of it, so they salvage any useful bits and scrap the rest (for example, there's one busied under the tunnel floor in the Channel Tunnel). They cost about 10 million a shot to build, and the project is going to take five years or so, and I would imagine that renting them would cost considerably more.

There are eight in all being used for this, so it's a fairly expensive project!

Date: 2012-03-16 01:29 am (UTC)
ext_196996: My avatar (Default)
From: [identity profile] johnreiher.livejournal.com
The Beeb has an article on your mole problem Marcus:

http://www.bbc.co.uk/news/uk-17365934

Date: 2012-03-16 07:54 am (UTC)
From: [identity profile] ffutures.livejournal.com
Yes, it's linked in the first comment ;-)

Date: 2012-03-16 07:58 am (UTC)
From: [identity profile] ffutures.livejournal.com
forgot to add that since there are generally two machines meeting in the middle of each length of tunnel, and they narrow the tunnel by lining it as they work, they pretty much have to do it that way since there's no way of backing out.

December 2025

S M T W T F S
  12 3 456
7 89 10111213
14 15 16 1718 1920
21 22 2324252627
28 29 3031   

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Dec. 31st, 2025 08:41 pm
Powered by Dreamwidth Studios