We had to get a larger diameter pipe from the meter to the boiler when ours was replaced. The requirements had changed since the old one was installed. This meant we had to lift the kitchen floor for the new pipes, and ended up redoing the whole kitchen in the process.
no subject
Date: 2022-03-08 03:18 pm (UTC)