Feb. 24th, 2012

ffutures: (Default)
Spotted by [livejournal.com profile] vicarage

A tour of the crossrail portal under construction at Royal Oak. This was in September - they've since erected a complicated steel structure above the portal, which I think is part of the spoil removal system.

http://www.ianvisits.co.uk/blog/2011/09/23/a-tour-of-the-crossrail-tunnel-portal-at-royal-oak/

Meanwhile traffic in this area is still massively disrupted - the end of my road will be closed at least another month, the street beside Paddington Station for 2+ years, etc. etc., the roundabout near Paddington Green for at least as long. Fun fun fun!

April 2026

S M T W T F S
   1234
56 7891011
12 1314 15161718
19 2021 22232425
26 27282930  

Most Popular Tags

Page Summary

Style Credit

Expand Cut Tags

No cut tags
Page generated Apr. 27th, 2026 09:11 pm
Powered by Dreamwidth Studios